Instructions:
• Wear gloves and shake the product before use.
• Thoroughly clean the walls of the formwork before applying the release agent.
• Apply the oil with a roller or a brush, taking care to check that the oil penetrates well into the pores of the formwork.
• Always apply the release agent evenly and without excess, and never on the reinforcements.
• On vertical formwork, rubbing or using a rubber squeegee eliminates excess and improves the appearance of the facings.
• On horizontal moulds, take care to avoid excess by passing the rubber squeegee or cloth.
• Let the oil dry for at least 1 hour before pouring.
• Apply a second coat of form oil when reusing the mold after the first pour.
• Do not mix the product with other liquids.
• Avoid excess formwork oil so as not to cause tearing of the skin of the concrete, dusting, bubbling.
Avis
Il n’y a encore aucun avis